OEKOSTROUM

FEELEN S.A.

 

With the commissioning on 7/14/18, OekoStroum Feelen S.A. owns a Siemens wind turbine with an average annual output of 8,200,000 kWh/year. OekoStroum Feelen S.A. is a subsidiary of EMCA S.A., whose primary objective is to provide alternatives to conventional energy generation such as coal and nuclear power.     

Green electricity - for a livable & sustainable future.

OEKOSTROUM S.A.

KEY FACTS

OEKOSTROUM FEELEN S.A.

OekoStroum_Produktionsleistung.png
3.2 MW

Total rated power produced

OekoStrom_Stromproduktion.jpg
8,200,000 kWh

electricity production per year

OekoStroum_Haushalte.png
1,820

supplied 4-person households

CO2
5,500,000kg

CO2 emission reduction

JPR7858-min.jpg
ENVIRONMENTAL MEASURES
  1. Planting of an oak-hornbeam forest on an area of approx. 2,500 sqm north of the wind turbine.

  2. Installation of two woody strips , one parallel to an existing strip of wood located south of the wind turbine, one further north of the system.

  3. Spreading of an existing hedge north of the site. 

PROTECTIVE MEASURES

1. BIRD PROTECTION:

  • Deliberately unattractive ​ design of the mast foot areas

  • Minimization of boundary structures

  • Temporary shutdown of the wind turbine after field work

  • Cultivation of suitable field crops

  • Creation of field edge flower strips (length at least 500 m, width at least 4 m, distance to the wind turbine at least 300 m)

 

2. BAT PROTECTION:

  • Determination of shutdown algorithms

  • Implementation of a nacelle monitoring

  • Creation of crossing aids (hedgerows) between forest massifs

  • Unattractive design of the wind turbine environment (double rotor radius around the wind turbines)

  • ​Planting of field edge flower strips (length min. 500 m, width min. 4 m, distance to the wind turbine min. 300 m)

  • Creation of roosting sites, e.g. by installing bat boxes

  • Checking potential clearing areas for bat roosts

  • Ecological construction monitoring

3. WILDCAT PROTECTION:

  • Creation of hedge strips with extensive meadow in the middle section

4. DORCE PROTECTION:

  • Check older trees in the proposed vicinity for dormouse occurrence prior to clearing

  • Planting of oak-hornbeam woodland

Image by Nils Bouillard
JPR8348-min.jpg
PARTICIPATION

Residents of the community of Feulen can buy shares in the wind turbine project. This is done through a separately established civil company - Feelen Wand sc. This company is the owner and manager of the transfer station, which contains all the fuses and meters of the power grid produced by the company. The share certificates are paid back every six months within 10 years with a return of 5%.     

OEKOSTROUM FEELEN

OEKOSTROUM FEELEN

VIDEOS FEELEN
BILDER FEELEN

PARTNERS + SUPPLIERS

OEKOSTROUM FEELEN SA

Becolux +++ Commune de Wincrange +++ Creos +++ Dewi +++ Elys +++ Fiduciare Benoy Kartheiser +++ KPMG +++ Linklaters +++ Luxcontrol +++ Max Bögl +++ Ministère du Développement Durable et des Infrastructures +++ Oeko Bureau +++ P. Adams Transpalux +++ Paul Wurth +++ P&T Luxembourg +++ Pèpinières forestières Erny Schmitz +++ Siemens +++ TÜV Rheinland + ++ Overwhelm Courtier en Assurances +++ Vic Elvinger +++ Vinandy +++ Wickler

bottom of page